OPTIMALISASI PEMBANGUNAN PROYEK APARTEMEN SGC CIBUBUR DENGAN MENGGUNAKAN METODE PRECEDENCE DIAGRAM METHOD (PDM)

ARIZAL NURHIDAYAT, BASUKI ARIANTO, W. TEDJA BHIRAWA

Sari


PT JG Tbk which is engaged in building construction. This company was founded in 1980, although it has been around for decades, and has experienced various types of building construction models. Companies often experience work delays at the time of implementation, because the delay in project work is not carried out right at the time of the agreement. Therefore, it is necessary to analyze the project scheduling so that it can be seen how long the project can be completed. The stages at the completion of the SGC project on floors 3 to 5, namely: determining the stages of activities, compiling new networks, making precedence diagram method activities, estimating manpower costs. In the case of the construction of the SGC Cibubur apartment floors 3 to 5 floors. With scheduling data from the company, which is for 497 days, the wages of masons, workers and foremen are Rp. 5,886,132,300.00 with the calculation of wages for mason workers, kenek and foremen using the PDM method of Rp. 5,401,080,000.00 savings in labor wages to Rp. 485,052,300.00 from the results of calculations using the PDM method is far more optimal than the calculations used by the company. Keywords: Project, Critical Path, Networking Diagram, Precedence Diagram Method (PDM)

Teks Lengkap:

PDF

Referensi


Dimyati dan Nurjaman. 2014.

Manajemen Proyek.

Yogyakarta: Pustaka Setia.

Djojowirono.s. 2005, Manajemen

Kontruksi. KMTS FT.

UGM, Yogyakarta.

Husein. 2011. Manajemen Proyek.

Edisi Revisi. Andi.

Yogyakarta. Heizer, Jay dan

Barry Render, “Operation

Management”, edisi ke-7,

Salemba Empat,

Jakarta,2006.

Istimawan, Dipohusodo. 2015.

Manajemen Proyek dan

Konstruksi. Jilid 2. Penerbit

Kanisius.Yogyakarta.

Herjanto, Eddy. (2011).

“Manajemen Operasi”. Edisi

Ketiga. Jakarta: Grasindo.

Arianto, A. (2010). Metode Bar

Chart, CPM, PDM, PERT,

Line of Balance dan Time

Chainage Diagram dalam

Penjadwalan Proyek

Konstruksi. Semarang:

Universitas Diponegoro.

Asiyanto. 2005, Construction

Project Cosy Management,

Penerbit Pradnya Paramita,

Jakarta.

Handoko. 2016. Dasar-Dasar

Manajemen Produksi dan

Operasi. Edisi 1. Yogyakarta

: BPFE UGM.

Muhardi. 2011. Manajemen

Operasi Suatu Pendekatan

Kuantitatif Untuk

Pengambilan Keputusan.

Bandung : Refika Aditama.

Haming dan Mahfud

Nurnajamuddin. 2016.

Manajemen Produksi

Modern. Jakarta: Bumi

Aksara.




DOI: https://doi.org/10.35968/jtin.v10i1.706

Refbacks

  • Saat ini tidak ada refbacks.


Indexed by: