PENERAPAN WASTE ASSESSMENT MODEL DAN VALUE STREAM ANALYSIS TOOLS UNTUK MENINGKATKAN EFISIENSI DI PT. XYZ
Sari
Abstract
This research aims to improve the efficiency of the clean water processing by minimizing waste that occured throughout the entire process where in the actual cannot meet with the customer demand in the amount of 3.800.000 m3 per month, while the average process capacity per month only 87% of demand or around 3.306.000 m3 per month. Lean Manufacturing methods that used in this research are Waste Assessment Model and Value Stream Mapping to identify the waste and Value Stream Analysis Tools to choose the most suitable waste analysis tools. According to the result of waste identification in clean water processing at PT XYZ, 2 wastes with the highest ranking found, the wastes are Processing Waste with the precentage of 27,04% and waiting waste with the percentage of 18,96%. VALSAT Tools which used to minimize the waste in this research is Process Activity Mapping (PAM), and according to the analysis of Process Activity Mapping, we knew that 33,84% of the process is Value Added, 3,91% of the process is Non-Value Added, and 62,25% of the process is Necessary Non-Value Added. According to the analysis result mentioned, 2 recommendations were proposed, which are combine a couple of similar inspection process and add more machine to process the PW-55, Coagulan, and Soda Ash. These recommendations will improve the efficiency of clean water processing at PT XYZ where the Value Added increase from 33,84% to 40,28%, percentage of Non-Value Added increase from 4,51% to 4,83% and the percentage of Necessary Non-Value Added decrease from 61,65% to 54,89%. The time needed in the process is also decreasing from 19.950,3 seconds to 16.760,3 seconds.
Keyword : Lean Manufacturing, Waste Assessment Model, Value Stream Analysis Tools, Value Stream Mapping, Process Activity Mapping.
Teks Lengkap:
PDFReferensi
Akbar, Faisal. 2011. “Perancangan LeanProduction System Dengan Pendekatan Cost Integrated Value Stream Mapping Studi Kasus Pada Industri Otomotif “. Program Studi Teknik Industri. Depok : Universitas Indonesia.
Daonil. (2012). “Implementasi Lean Manufacturing Untuk Eliminasi Waste Pada Lini Produksi Machining Cast Wheel Dengan Menggunakan Metode WAM Dan VALSAT “. Depok: Program Studi Teknik Industri Universitas Indonesia.
GasperszVincent. 1998. Statistical Process Control Penerapan Teknik-Teknik Statistical Dalam Manajemen Bisnis Total. PT Gramedia Pustaka Utama. Jakarta.
Liker, Jeffrey K. 2006. The Toyota Way (14 Prinsip Manajemen). Jakarta : Erlangga.
Misbah, Achmad, Pratikto dan Widhiyanuriyawan, Denny. 2015. “Upaya Meminimalkan Non Value Added Activities Produk Mebel Dengan Penerapan Metode Lean Manufacturing“. VOL.3 NO.1. JEMIS.47-54.
Octavia, Tanti dan Prajogo, Daniel Indarto dan Prabudy, Lia Magdalena. 2000. “Studi Tentang Peta Kendali P Yang Distandarisasi Untuk Proses Pendek Kualitas“. VOL. 2, NO. 1, JUNI 2000: 53 – 64.
P, M, Fajar Hariadi. 2007. “Upaya Menurunkan Jumlah Cacat Pada Mesin Dual Daptc 611 Dengan Menggunakan Metode Fmea PadaPT. Filtrona Indonesia, Sidoarjo“. Undergraduate. Surabaya : Institut Teknologi Surabaya.
Sutalaksana, Iftikar Z. 1979. Teknik Tata Cara Kerja. Bandung : Departemen Teknik Industri, Institut Teknologi Bandung, Bandung.
Wibisono, Himawan. 2012. “Perancangan Lean Process Menggunakan Value Stream Mapping Dan Detail Process Charting Pada Perusahaan Auto Komponen Lapis Kedua Di Indonesia“. Program Studi Teknik Industri. Depok : Universitas Indonesia.
DOI: https://doi.org/10.35968/jmm.v9i1.493
Refbacks
- Saat ini tidak ada refbacks.
Indexed by: